Condominiums · Milestone Inspections and SIRS

Your engineer found it.
We repair it.

We are a licensed Florida general contractor for the concrete, waterproofing, painting, railing, balcony and breezeway repairs that follow a milestone inspection or a Structural Integrity Reserve Study, with the 365-day repair clock in mind.

Licensed and insured · CGC1533292 · We follow up the same business day
An ESS crew member painting trim on a stucco building
365 days
To commence repairs after a phase two report
The Law

What the Law Asks of Your Building

The two requirements that drive most engineer’s reports, in plain English.

Milestone Inspections

  • Applies to condominium and cooperative buildings three habitable stories or more.
  • Due at 30 years from the certificate of occupancy (25 years at the local agency’s option), then every ten years.
  • Phase one is a visual inspection. Phase two follows only if substantial structural deterioration is found.
  • Repairs must be commenced within 365 days of the phase two report.
s. 553.899, Florida Statutes

Structural Integrity Reserve Study

  • Required every ten years for each building three habitable stories or higher.
  • Covers the roof, structure, waterproofing and exterior painting, windows and doors, plumbing, electrical and fire protection.
  • Also covers any other item with a replacement or deferred-maintenance cost of $25,000 or more.
s. 718.112(2)(g), Florida Statutes

Not Sure It Applies to You?

Enter your building’s stories and certificate of occupancy year. The checker shows whether s. 553.899 applies and your first due date.

Check your deadline →

General information, not legal advice. Confirm dates and requirements with your association’s attorney and engineer.

How We Work

How We Work With the Engineer and the Board

1

Read the Report With You

We read the engineer’s report with you and walk the building, so we scope what is actually there.

2

Scope Every Finding

We scope each finding as its own line with photos, so your board can vote on it.

3

Phase Around Residents

We phase the work around residents and the 365-day clock.

4

Document Completion

We document completion for the engineer and for your records.

2,428
Completed projects
748
Five-star reviews
50+
Team members
1,462
Happy customers
Reviews

What Managers and Boards Say

★★★★★
“Since I manage several condo associations, it’s super important to have a vendor like Elements that I can rely on … with the many maintenance issues that come up day to day.”
Carol S.Licensed CAM
★★★★★
“Element Service Solutions is top-notch. As a manager for various properties, I’ve seen their exceptional work firsthand. They deliver great results and I highly recommend them for any project.”
Cindy S.Vice president, property management
★★★★★
“As a VP working with numerous properties, I can confidently say that ESS is outstanding. Their work is exceptional, and their prices are competitive. I highly recommend them for anything construction and landscaping.”
Jamie B.Vice president, property management
Questions

Milestone Inspection and SIRS Questions

Does this apply to our HOA of townhomes?
Usually not. Milestone inspections and Structural Integrity Reserve Studies apply to condominium and cooperative buildings under Chapters 718 and 719, Florida Statutes. A homeowners’ association of townhomes or single-family homes is not covered unless a building in it is legally a condominium. Confirm with your association’s attorney.
What does phase two mean?
A milestone inspection starts with phase one, a visual inspection by an engineer or architect. Phase two follows only if phase one finds substantial structural deterioration. It is a more detailed investigation, and its report is what starts the repair clock.
How fast do repairs have to start?
Under s. 553.899, Florida Statutes, repairs must be commenced within 365 days of the phase two report. That is why we scope and phase the work early, so your board can vote and schedule with the clock in mind.
Can you work while residents are in the building?
Yes. We phase the work around residents and give written notices before each area is affected, so the building stays occupied while repairs move forward.
Do you provide a certificate of insurance naming the association?
Yes. We provide certificates of insurance naming the association as additional insured, on request before work starts.

Have an engineer’s report in hand?

Send us the property name and your board meeting date. A real person follows up the same business day.

Request a Proposal Book a complimentary on-site inspection
Return to top