Reserve line-item estimator
List your components, when each was last done, how long it should last and what it costs today. See a funding timeline, how many years until a shortfall, and whether a special assessment is a risk.
What you get
Your numbers, your inflation rate. Nothing is stored.
Educational planning tool, not a reserve study. It projects when the components you list will need replacement and whether the reserve balance and contributions you enter can cover them. It cannot replace a reserve study or structural integrity reserve study prepared by a qualified professional. Every cost and life figure here is yours, so the answer is only as good as those inputs.
1. Your reserve basics
2. Your components
Enter what it costs to replace or restore each component today, in current dollars, from a recent bid or your reserve study. Rows without a cost are ignored. Expected life starts at the directional ranges noted in the hint, which you should replace with your engineer's or reserve analyst's figure.
Save your results and get a follow-up from a real person
Want a copy of these results, or a second set of eyes on your property? Leave your details and an Element Service Solutions team member will follow up the same business day.
Prefer to pick a time now? Book a complimentary on-site inspection or a 15-minute call.
Seminole, Orange, Lake and Volusia counties